Straw Bale Wall System Guide

Layer-by-layer specs and substrate prep for plastering straw bale walls with the Earthaus BUILD PHL system.

This Help Center article is a summary of the official Earthaus Straw Bale Wall System Guide. Download the full Straw Bale Wall System Guide (PDF).

Overview

The Earthaus BUILD Pozzolanic Hydraulic Lime (PHL) Plaster System is designed for straw bale construction. It is standardized but versatile enough to be modified for project-specific needs.

Key Properties:

  • Specialized plaster formulas with high-plasticity lime and pumice pozzolan.

  • Breathable plaster system allows straw to release moisture, reducing mold and structural risks.

  • Slow, steady curing supports structural flexibility and lowers cracking probability.

Exterior System (Straw Bale Walls):

Layer

Product

Thickness

Coverage

Scratch Coat

3/8" (1 coat)

65 ft²

Brown Coat

PHL Binder

1/2" (1 coat)

65 ft²

Finish Option 1

1/4" (1 coat)

50 ft²

Finish Option 2

1/8" (1 coat)

100 ft²

Sealer (optional)

TBD

Interior System (Straw Bale Walls):

Layer

Product

Thickness

Coverage

Scratch Coat

PHL Binder

3/8" (1 coat)

65 ft²

Brown Coat

PHL Binder

1/2" (1 coat)

65 ft²

Finish Option 1

1/8" (1 coat)

100 ft²

Finish Option 2

1/16" (1 coat)

250 ft²

Sealer (optional)

700 ft²

Straw Bale Substrate Preparation

  1. Bale Inspection and Adjustment — Walls must be stacked tightly, plumb, and straight. Pack voids with loose straw for uniform density. Even out undulating walls by applying additional plaster coats with 10 days of curing between each (not one thick pass).

  2. Trimming and Shaping — Remove debris and use a chainsaw or weed trimmer to create an even surface.

  3. Check Moisture Levels — Bales must be dry before plastering. Target moisture content: below 18%.

  4. Dampen Before Plastering — Pre-dampen the straw with a fine mist; the goal is moist/darkened, not saturated.

  5. Plaster Stops & Lath — Protect wood with felt paper plus expanded metal lath. Recommended: embed fiberglass reinforcing mesh in the brown coat to reduce cracking.

PHL Binder Installation

Scratch Coat:

  • Thickness: 3/8". Scarify horizontally 1/4" deep while wet.

  • Cure 10 days before applying the brown coat.

Brown Coat:

  • Thickness: 1/2". Cure 10 days before applying finish coats.

Applying the Finish Coat

After the brown coat has cured (10 days), apply your selected finish from the system table above:

Pigment color and optional sealer are listed in the system table above.